Youngson Road Reservoir
Client: Preco Limited
Contractor: Brian Perry Civil
Status: Construction
Novare was engaged for the design and construction monitoring of a 3 Mega-Litre reservoir in Omokoroa, Bay of Plenty.
The designs include post-tensioned floor slabs, prestressed and post-tensioned wall elements, and prestressed roof panels. The roof panels are supported by a central column to maximise potable water storage.